The back road is progressing VERY nicely. Here are some pictures as testimony. On November 24th they were scraping and rollering the roadbed, which to my uneducated eye looked very close to ready for the asphalt. The manholes are in and covered. The curb concrete is in... and note the wall and railing just SW of the area where the road meeets SO Blvd at the top of the East side hill.
No comments:
Post a Comment